Green Mountain Club
Montpelier Section


See GMC Archives for all
Long Trail News and Long Trail Guides.
Trip Reports
May 28, 2011
LT/Elephant's Head Trail

Do to recent heavy rains, the Notch Brook was not fordable. Instead, our small group of five regular volunteers drove on to the Notch and swept the Sterling Pond Trail. Almost all of the drainage structures are overtopped and not functional. 75% of the trail had water running on the treadway. These waterbars, ditches, and stairs need major rehabilitation. This job is beyond the ability of the Section. Since we were unable to get to our main work assignment, we will plan to use the already scheduled 6/25 work party to cruise this trail. Earlier scouting suggest some blowdowns, but trail was passable.

Eric Seidel

© 2018 Montpelier Section of The Green Mountain Club, Inc.     Top    Sun 5 Aug 2018